From David Davenport Working on Eagle project;
The work days of Eagle project are: April 10 and 24 from 9 am to 4 pm
at the
[avatar user=”ddavenport623@gmail.com” size=”original”]Eagle project [/avatar]Sullivan West Volunteer Fire Station (113 Rosemont St).
- Scouts will be digging about 5 in in the ground, spreading gravel, spreading sand, tamping sand, lay paver stones.
- (The Davenports) will provide chicken sandwiches for lunch.
- Snacks will not be provided.
- Water will be provided
David needs at least one more adult leader for the day
- We will not start work if there is a high chance of rain. David Davenport will make that call on friday.
- We will have a canopy for shade.
- Volunteers would need to bring a shovel, work gloves, wheelbarrows, and a tamper if available.